Optimalization Study Of Parking Facilities In The Parking Area Of Central Chandra Department Store, Bandar Lampung

Riska Adelia Riska Adelia, Muhammad Karami, Siti Anugrah Mulya Putri Ofrial | Pages: 31-36

Run-Off Hidrological Analysis Using HEC-HMS 4.11 Software (Case Study In Fakultas Teknik, Unversitas Lampung)

abdul rohman abdul, Riki Chandra Wijaya, Ofik Taufik Purwadi | Pages: 18-25

Quantity Material Take Off Penulangan Kolom Zona B Gedung Perawatan Bedah Terpadu RSUD Dr. H. Abdul Moeloek dengan Building Information Modelling (BIM)

mellynia saputri, Bayzoni, Hasti riakara Husni, Chatarina Niken Dwi Wahyuni Setia Budi Utami | Pages: 7-12

Analysis Of Hotel Parking Characteristics And Needs In Lampung (Case Study: Horison Hotel Lampung)

Luthfi Radhwa Sultoni, Tas’an Junaedi, Dwi Herianto | Pages: 26-30

Analisis Reliabilitas Waktu Tempuh di Jalan Imam Bonjol Kota Bandar Lampung menggunakan Metode Tardy Trips

Azmi Pratama, Muhammad Karami, Siti Anugrah Mulya Putri Ofrial | Pages: 1-6

Perbandingan Perhitungan BoQ antara Revit 2019 dengan Dokumen Perencanaan pada Pekerjaan Non Struktur

Putri Ferira Zumarnis, Hasti Riakara Husni, Bayzoni, Amril Ma’ruf Siregar | Pages: 13-17